Network Modelling Projects

Johor Network Modelling Project   Location : Johor, Malaysia  Client : SAJ Holdings Sdn. Bhd.  Start Date : Oct 2005  Completion : Dec 2009  Description : The assignment involves the construction of fully calibrated all-mains network models for the entire Johor supply system for SAJ Holdings, Johor, Malaysia. The project Scope of Works includes undertaking model construction, demand allocation, field testing, model calibration and development and training of SAJ Holdings Sdn. Bhd. staff. Status : Completed

Jurong, Singapore Network Modeling Field Testing    Location : Jurong, Singapore  Client  : Credent Technology Ltd  Start Date : July 2006  Completion : Sept 2006  Description : Pressure, flow and reservoir level field testing of the PUB Supply System in Jurong, Singapore. The field test data are used to calibrate water network model being constructed for PUB.  Status : Completed

SAMB All Mains Modelling Project  Location : State of Melaka, Malaysia  Client : Syarikat Air Melaka Berhad Start Date : July 2009 Completion : March 2011 Description :  This project involves the construction of fully calibrated all-mains network models for the whole state of Melaka water supply system including one strategic mains model supplied to Petronas.  The project Scope of Works includes undertaking model construction, gis verification, demand allocation, field testing, model calibration and development and training of SAMB staff. Status : Completed

Malang Network Modeling Project (Mojolangu area), Kota Malang, Indonesia Location : Malang, Indonesia Client : Credent Technology Ltd Start Date : December 2007 Completion : December 2008 Description : A contract to create an All Mains Model of the Mojolangu area of Malang City in Indonesia. The assignment involves the construction fully a calibrated all-mains network model, along with the establishment of 4 No. DMAs, to assist in managing this part of the network Status : Completed

 

Search