Engineering Procurement and Construction

Raw Water Transfer Project in Pasir Gudang, Johor, Malaysia Location : Pasir Gudang, Johor, Malaysia Client : Johor State Economic  Planning Unit  Start Date : March 2010 Completion : Jan 2011 Description : Design, construction, supply, delivery, installation, integration, testing and commissioning of Raw Water Pumping Station of capacity 1.32 MGD. Supply and laying of 14km of 600mm diameter Mild Steel pumping line and 2.7km of 800mm diameter Mild Steel falling main from Tanjung Langsat reservoir to Bahru Steel plant. Status : Completed

NKEA Greater KL (River of Life) : Sewerage Pipe Rehabilitation In The Centre Of Kuala Lumpur City Location : Federal Territory, Kuala Lumpur, Malaysia Client : Ministry on Energy, Green Technology and Water Start Date : March 2012 Completion : Sept 2014 Description : The general scope of work is to carry out rehabilitation and replacement works for the existing sewer pipes of various sizes at various locations in Kuala Lumpur city centre. Status : Under Implementation

Semanggol Water Treatment Plant Upgrading (Phase 3Location : Perak, Malaysia Client : Lembaga Air Perak Start Date : April 2013 Completion : Dec 2013 Status : Completed

Reticulation and Reservoir works for infrastructure development in Pengerang, Kota Tinggi, Johor. Location : Johor, Malaysia Client : KEJORA Start Date : April 2013 Completion : December 2013 Status : Completed

Search