NRW Projects

Non Revenue Water Reduction Contract for SAJ Holdings  Location : Johor, Malaysia Client : SAJ Holding Sdn Bhd  Start Date : April 2005  Completion : Mar 2011  Description : Holistic performance based NRW reduction management contract. Scope of works includes DMZ establishment, active leakage detection, repairs, reservoir monitoring, flow balancing and all-mains network modelling. The Contract offer new approach for outsourcing NRW reduction works with the client guaranteed with progressive reduction in NRW levels.  Status : Completed

NRW Study for Perbadanan Air Melaka  Location : Melaka, Malaysia  Client : Perbadanan Air Melaka  Start Date : Aug 2005  Completion : Jan 2006  Description : Establishment of pilot District Meter Zone (DMZ) and NRW reduction works at Air Keroh Industrial Area.  Scope of works: DMZ Establishment – DMZ design, isolation and peak flow testing, Legitimate Night Flow measurement, customer tagging, pressure survey, and DMZ manual, DMZ Analysis – Flow Measurement, Leakage Analysis and NRW Analysis, NRW Reduction – Flow Balancing, Step Testing, Leak Detection and Leak Repair  Status : Completed

Leakage Detection for JYP Management  Location : Johor, Malaysia Client : JYP Management Sdn. Bhd. Start Date : Aug 2005  Completion : Aug 2005 Description : Leakage detection on water reticulation at and real estate development in Bandar Pulai Jaya, Johor, Malaysia. Status : Completed

Changi Airport Leakage Detection  Location : Changi Airport, Singapore  Client : ST Synthesis Pte. Ltd. Start Date : June 2006  Completion : July 2006  Description : Comprehensive leakage detection on three (3) pipe system at Changi International Airport, Singapore i.e. fire main, industrial main and potable water main. The works require considerable expertise to locate pipe leaks in an extremely “noisy” environment.  Status : Completed 

NRW Study for Perbadanan Air Melaka  Location : Melaka, Malaysia  Client  : Perbadanan Air Melaka StartDate : July 2006 Completion : Jan 2007  Description : Establishment of 3 pilot District Meter Zones (DMZs) and NRW reduction works at Kampung Lapan, Melaka.  Status : Completed

Non Revenue Water Reduction (NRW) Works In The State Of Melaka  Location : Melaka, Malaysia Client  : Syarikat Air Melaka Berhad  Start Date : December 2007  Completion : December 2011 Description : Holistic performance based NRW reduction management contract. Scope of works includes DMZ establishment, active leakage detection, repairs, reservoir monitoring, flow balancing and all-mains network modeling. The Contract offer new approach for outsourcing NRW reduction works with the client guaranteed with progressive reduction in NRW levels.  Status : Completed

Non Revenue Water Reduction (NRW) Works In The District Of Kedah Tengah  Location : Kedah, Malaysia Client : PJS Utilities - Z&I JV  Status   : Sub Contractor to PJS Utilities - Z&I JV Start Date : March 2008 Completion : September 2010 Description : This project will assist the performance of Jabatan Bekalan Air (JBA), Kedah, as water losses that are captured will give additional revenue to the Water Department either through additional revenue or lower operations cost. Scope of works includes DMZ establishment, active leakage detection, repairs, reservoir monitoring and flow balancing.  Status : Completed

Leakage Reduction in Riyadh, Saudi Arabia  Location : Riyadh, Saudi Arabia  Client Ranhill Arabia Company StartDate : Feb 2009  Completion : Jul 2011  Description : Survey works, Data gathering, GIS updating, Meter evaluation, Design and establishment of DMAs, Leakage detection activities  Status : Completed

NRW Study for Perak  Location : Jln Kubu Gajah, Taiping, Perak, Malaysia Client Millenia Aqua Services Sdn. Bhd. (MASSB)  StartDate : Oct 2010  Completion : Dec 2010  Description : DMZ Verification, DMZ Analysis (Flow Measurement, Leakage Analysis and NRW Analysis) and NRW Reduction ( Leak Detection and Leak Repair)  Status : Completed

Non Revenue Water Reduction Contract for SAJ Holdings  Location : Johor, Malaysia  Client : SAJ Holding Sdn Bhd  StartDate : July 2011  Completion : June 2013  Description : NRW reduction management contract.  Scope of works : DMZ establishment, active leakage detection and repairs. Status : Completed

Leakage Detection in Besut & Setiu, Terengganu, Malaysia  Location : Besut & Setiu, Terengganu, Malaysia Client : Syarikat Air Terengganu Sdn. Bhd.  Start Date : Oct 2011 Completion : March 2013  Description : Active leakage detection and repairs. Status : Completed 

Consultation and Maintenance for Non Revenue Water Reduction (NRW) Works In the State Of Melaka  Location : Melaka, Malaysia  Client   : Syarikat Air Melaka Berhad  StartDate : May 2012 Completion : April 2014 Description : NRW consultation and maintenance contract. Scope of works includes leakage detection and repairs. Status : Under Implementation

Leakage Detection in Hulu Terengganu & Dungun, Terengganu, Malaysia  Location : Terengganu, Malaysia Client : Syarikat Air Terengganu Sdn. Bhd.  StartDate : Oct 2012  Completion : Jan 2014 Description : Active leakage detection and repairs  Status : Under Implementation

Active Leakage Control and NRW works in the State of Kelantan, Malaysia  Location : Kelantan, Malaysia Client  : Air Kelantan Sdn. Bhd.  StartDate : Feb 2013  Completion : Feb 2015 Description : Active leakage detection and repairs  Status : Under Implementation

Non Revenue Water Reduction Contract for SAJ Holdings  Location : Johor, Malaysia  Client : SAJ Holding Sdn Bhd  StartDate : July 2013  Completion : June 2015  Description : NRW reduction management contract.  Scope of works : DMZ establishment, active leakage detection and repairs.  Status : Under Implementation

Search